Check out the traffic and travel updates for current and forthcoming road closures and roadworks in Cambridgeshire on Monday, March 11.

Common Road - Brinkley

This road is currently closed for emergency repairs to the carriageway.

Church Road - Christchurch

Surface treatment works are taking place under two-way signals until March 19 daily from 8am-5pm (weekdays only).

Flooding:

The A14 eastbound is now open. Lane 2 between J37 Newmarket and J38 has been reopened with only one lane remaining closed. 

King Street - Cambridge

The road between Manor Street and Malcom Street will be closed to all motor vehicles between March 11-14 between the hours of 9pm-6am due to works by Openreach

Main Street - Littleport

The road will be closed to all motor vehicles between March 11-15 due to works by Cadent Gas. 

Morton Close - Ely

The road is closed for carriageway surface treatment works until March 11 daily from 8am to 5pm. (weekdays only).

High Street - Meldreth

The road will be closed both ways to all motor vehicles until March 22 (weekdays only) between the hours of 9:30am and 2:30pm daily for works.

St Anns Lane - Godmanchester

The road is closed both ways to all motor vehicles until March 11 due to emergency works by UK Power Networks.

Main Street - Yaxley

The road will be closed both ways to all motor vehicles between March 1-12 between the hours of 9:30am and 3:30pm for works.

Dry Drayton Road - Oakington

The road will be closed both ways to all motor vehicles between March 4-15 (weekdays only) between the hours of 9:30am and 2:30pm daily for carriageway works. 

Hinton Way - Great Shelford

The road will be closed both ways to all motor vehicles between March 4 to June 7 due to works by Cadent Gas.

Swaffham Heath Road - Dullingham

The road will be closed both ways to all motor vehicles between March 4 - June 12 for works.

New Barns Lane - Conington

The road will be closed both ways to all motor vehicles until March 8 between the hours of 7:30am and 4pm daily for works.

Chandlers Way - March 

Footway works are taking place until March 8 daily between 8am-5pm. 

Wisbech Road - Littleport

The road will be closed both ways to all motor vehicles due to scheduled works by Anglian Water. 

B1098 Sixteen Foot Bank – Stonea 

Closed until March 8 due to works by Anglian Water. 

Rail Engineering Work - Midland Main Line

On March 9-10, March 17 and March 23-24, engineers will be laying new track to deliver smoother journeys between Syston and Helpston which will affect CrossCountry services from Leicester to Peterborough. A rail replacement bus will be in place to serve passengers along this route.

High Street - Little Shelford

The road will be closed both ways to all motor vehicles between March 11-15 between the hours of 9:30am and 3:30pm daily due to works by Open Reach.

Cants Drove and B1187 Gull Road - Murrow/Guyhirn

The road will be closed both ways to all motor vehicles between March 11-15 (weekdays only) between the hours of 8am and 5pm daily for works.

Trinity Road - Wisbech

The road will be closed both ways to all motor vehicles between March 11-15 due to works by Cadent Gas Ltd.

B1098 Sixteen Foot Bank - Christchurch

The road will be closed both ways to all motor vehicles between March 11-15 between the hours of 9:30am and 3:30pm daily for works.

Broughton Lane - Broughton

The road will be closed both ways to all motor vehicles between March 11-15 due to works by Cambs Water.

Little Green - Cheveley

The road will be closed both ways to all motor vehicles between March 11-22 due to works by Open Reach.

Ross Street - Cambridge

The road will be closed to all motor vehicles between March 11-13 due to works by Cambs Water.

Hinton Road - Fulbourn

The road will be closed both ways to all motor vehicles between March 11-29 due to works by Cadent Gas Ltd.

Stonald Road - Whittlesey

Closed both ways to all traffic until March 12 due to work by Cadent Gas.

Burgess Road - Waterbeach

The road will be closed both ways to all motor vehicles between March 12-14 due to works by Cambs Water.

Washingley Lane - Stilton/Folksworth

The road will be closed both ways to all motor vehicles between March 13-15 between the hours of 9:30am and 3:30pm daily for works.

Main Street - Yaxley

The road will be closed both ways to all motor vehicles until March 15 between the hours of 9:30am and 3:30pm daily for carriageway works.

Forty Foot Bank - Chatteris

The road will be closed both ways to all motor vehicles until March 15 due to works by Anglian Water.

A10 Milton Bypass - Milton

The road will be closed both ways to all motor vehicles until March 15 between the hours of 9pm and 5am nightly (weeknights only) for carriageway works.

Newmarket Road - Great Abington (between Station Road and Bourn Bridge Road)

The road will be closed both ways to all traffic until March 15 between the hours of 7am and 5pm daily for works.

Fenstanton Busway

The South Section of the Busway will be closed in both directions for the erection of a permanent fence until March 29.

A505 Royston Road - Duxford

The road will be closed both ways to all motor vehicles until April 27 between the hours of 9pm and 5am nightly for works.

East Park Street - Chatteris

The road will be closed both ways during the night on April 19 for the construction of a new pedestrian crossing.